中文 | Nankai University

Jianyong ZHANG

Jianyong ZHANG
Associate Professor
Management Science & Engineering
Email:zhangjy94@nankai.edu.cn
Tel: 022-23498276
中文
  • Biography

  • Research & Achievement

  • Projects

  • Teaching

Research Areas

 

Logistics & Supply Chain Management;  Decision Analysis


Education

 

March,2001June, 2004  Doctor of Management, Southwest Jiaotong University;

September, 1998March, 2001  Master of Management, Southwest Jiaotong University.

September, 1994-June,1998 Bachelor of Engineering, Southwest Jiaotong University.


Professional Experience

July 2004Present,    Nankai University.


 
  1. Jianyong Zhang, Jun Li. Customer demand transfers and its research progress, commercial times,2014,30, 55-56
  2. Jun li,Jianyong Zhang.Tianjin city comprehensive transportation system present situation analysis and development stragtegy.Special zone economy.2011.9, 60-63
  3. Jun li,Jianyong Zhang.(2011) .Supply chain information sharing and its research progress. commercial times,2014 11, 25-26
  4. Willian J. Stevenson, Ceyhun Ozgur. Yongjian Li, Jianyong Zhang. Management Science. China Renmin University Press, 2013 
  5. Jianyong Zhang, Jun Li. Logistics system analysis. Beijing Jiaotong University Press. 2013
  6. Zhang Jianyong, Lijun. A Hybrid Genetic Algorithm to the Vehicle Routing Problem with Fuzzy Cost Coefficients, the 2014 11th International Conference on Fuzzy Systems and Knowledge Discovery , , Xiamen, China, 2014
  7. Lijun, Zhang Jianyong. A Heuristic Algorithm to VRP with the Consideration of Customers’ Service Preference, the 2014 11th International Conference on Fuzzy Systems and Knowledge Discovery , , Xiamen, China, 2014
  8. Zhang Jianyong, Lijun.  A Heuristic Algorithm to Vehicle Routing Problem with Fuzzy due timeProceedings of The 8th International Conference on Service Systems and Service Management2011
  9. Jianyong Zhang, Jun Li. A hybrid genetic algorithm to the vehicle routing problem with fuzzy traveling time, Proceedings of the Third International Conference on Management Science and Engineering Management, Bangkok, Thailand, 2009 
  10. Jianyong Zhang, Jun Li, Yaohuang Guo. An insertion heuristic algorithm to dynamic vehicle routing problem with fuzzy due-time. Journal of Southwest Jiaotong University, 2008 
  11.  Jianyong Zhang, Jun Li.A genetic algorithm to vehicle routing problem in reverse logistics, 2007 International conference in management science and Engineering., 2007
  12. Jianyong Zhang, Jun Li. A sweeping algorithm to vehicle routing problem with fuzzy demand. Chinese Journal of Manegement Science,2007
  13. Jianyong Zhang, Jun Li, Yaohuang Guo. Hybrid genetic algorithm to vehicle routing problem with simultaneous delivery and pick-up. Chinese Journal of Highway and Transport, 2006
  14. Jianyong Zhang, Jun Li, Yaohuang Guo. Hybrid genetic algorithm to vehicle routing problem with fuzzy due-time. Journal of Management Sciences in China,2005
  15. Jianyong Zhang, Yaohuang Guo, Jun Li. A genetic algorithm to fuzzy vehicle routing problem. Journal of Industrial Engineering and Engineering Management, 2005 
  16.  Jianyong Zhang, Jun Li, Yaohuang Guo. Research of vehicle routing problem under condition of fuzzy demand. Journal of Systems Engineering.2004
  17. Jianyong Zhang, Yaohuang Guo, Jun Li. Research of the fuzzy dynamic vehicle scheduling problem when demand at nodes is uncertain. Journal of Industrial Engineering and Engineering Management, 2004
  18. Jianyong Zhang, Yaohuang Guo, Jun Li. Modified Clark-Wright Algorithm for Vehicle Scheduling Problem with Fuzzy Cost Coefficients. Journal of Southwest Jiaotong University, 2004
  19. Jianyong Zhang, Yaohuang Guo, Jun Li. Research of multi-objective fuzzy vehicle scheduling problem based on satisfaction of customers, Journal of The China Railway Society, 2003
  20. Jianyong Zhang, Yaohuang Guo. A multimode transportation network assignment model, Journal of The China Railway Society, 2003 
  21.  Yongjian Li, Jianyong Zhang((Eds).). Operations Management, Ease China Normal University Press, 2010
  1. Jianyong Zhang, Jun Li. A hybrid genetic algorithm to the vehicle routing problem with fuzzy traveling time, Proceedings of the Third International Conference on Management Science and Engineering Management, Bangkok, Thailand, 2009 
    Jianyong Zhang, Jun Li, Yaohuang Guo. An insertion heuristic algorithm to dynamic vehicle routing problem with fuzzy due-time. Journal of Southwest Jiaotong University, 2008 
     Jianyong Zhang, Jun Li.A genetic algorithm to vehicle routing problem in reverse logistics, 2007 International conference in management science and Engineering., 2007
    Jianyong Zhang, Jun Li. A sweeping algorithm to vehicle routing problem with fuzzy demand. Chinese Journal of Manegement Science,2007
    Jianyong Zhang, Jun Li, Yaohuang Guo. Hybrid genetic algorithm to vehicle routing problem with simultaneous delivery and pick-up. Chinese Journal of Highway and Transport, 2006
    Jianyong Zhang, Jun Li, Yaohuang Guo. Hybrid genetic algorithm to vehicle routing problem with fuzzy due-time. Journal of Management Sciences in China,2005
    Jianyong Zhang, Yaohuang Guo, Jun Li. A genetic algorithm to fuzzy vehicle routing problem. Journal of Industrial Engineering and Engineering Management, 2005 
     Jianyong Zhang, Jun Li, Yaohuang Guo. Research of vehicle routing problem under condition of fuzzy demand. Journal of Systems Engineering.2004
    Jianyong Zhang, Yaohuang Guo, Jun Li. Research of the fuzzy dynamic vehicle scheduling problem when demand at nodes is uncertain. Journal of Industrial Engineering and Engineering Management, 2004
    Jianyong Zhang, Yaohuang Guo, Jun Li. Modified Clark-Wright Algorithm for Vehicle Scheduling Problem with Fuzzy Cost Coefficients. Journal of Southwest Jiaotong University, 2004
    Jianyong Zhang, Yaohuang Guo, Jun Li. Research of multi-objective fuzzy vehicle scheduling problem based on satisfaction of customers, Journal of The China Railway Society, 2003
    Jianyong Zhang, Yaohuang Guo. A multimode transportation network assignment model, Journal of The China Railway Society, 2003 
     Yongjian Li, Jianyong Zhang((Eds).). Operations Management, Ease China Normal University Press, 2010

Projects

 1.    Social Science Foundation of Tianjin: the Construction of Tianjin modern comprehensive transportation system.

2.    Project of Asia Research Center of Nankai university: Dynamic team forming and routing problem of emergency vehicles.

3.    Project of Liantai Supply Chain System Research & Development Center of Peking University.

4.    National Natural Science Foundation of China: How to Achieve the Process Design of Supply Chain and the Method and Knowledge Base of Modeling in process Re-engineering of Supply Chain (presided by Jianyuan Yan)

5.    National Natural Science Foundation of China: Vehicle Routing problem under Uncertainty Information (presided by Yaohuang Guo)

6.    985 Project of National Center for Innovation Research on Circular Economy(NCIRCE) in Nankai University: The Study on the Reverse Logistics Management of E-waste Based on Circular Economy,

7.    Project of Beichen District Government: The plan of Steel Logistics Park in Beichen District of Tianjin (presided by Jianyuan Yan);

Teaching

 

 

Undergraduate Courses: Operations Research, Operations Management, E-Commerce

Master Courses: Logistics & Supply Chain Management; Operations Analysis and Operations Management